Road Construction Project Description

Project Title:
Northridge Corridor Improvement Project

Location:
Northridge Avenue, spanning from Maple Street (KM 0+000) to Oakwood Boulevard (KM 3+200), City of Riverbend, State of Veridian

Project Duration:
Planned Start: March 1, 2026
Estimated Completion: November 30, 2027
(21-month timeline, weather-dependent)

Project Overview:
The Northridge Corridor Improvement Project is a comprehensive infrastructure initiative aimed at modernizing a critical urban arterial road to enhance safety, mobility, and connectivity for all users—motorists, cyclists, pedestrians, and public transit riders. The existing two-lane road, originally constructed in 1978, no longer meets current traffic demands or design standards and has deteriorated significantly.

Scope of Work Includes:

  1. Roadway Reconstruction & Widening:

    • Expand from 2 lanes to 4 lanes (2 in each direction), with dedicated left-turn bays at major intersections.
    • Full-depth asphalt pavement reconstruction with reinforced subbase for 30-year design life.
    • Installation of modern curb-and-gutter system with ADA-compliant ramps at all crosswalks.
  2. Drainage & Utility Upgrades:

    • Replacement of undersized stormwater culverts and installation of new bioswales and retention basins to mitigate flooding and improve water quality.
    • Relocation and upgrading of aging water, sewer, and fiber-optic lines in coordination with municipal utilities.
  3. Active Transportation Infrastructure:

    • Addition of 6-foot buffered bike lanes on both sides.
    • Construction of 8-foot-wide multi-use sidewalks with pedestrian lighting and landscaping.
    • Installation of 5 new pedestrian-activated crosswalks with countdown signals.
  4. Intelligent Transportation Systems (ITS):

    • Adaptive traffic signal system at 8 intersections.
    • Real-time traffic monitoring via embedded sensors and CCTV cameras.
    • Integration with the City’s Smart Mobility Platform for optimized traffic flow.
  5. Environmental & Aesthetic Enhancements:

    • Native tree planting (250+ trees) and drought-tolerant landscaping.
    • Noise barrier walls (1,200 linear feet) along residential sections.
    • Stormwater treatment wetlands to support local biodiversity.

Stakeholder Engagement:

  • Ongoing coordination with adjacent property owners, local businesses, schools, and transit authorities.
  • Biweekly public updates via project website, community meetings, and digital alerts.
  • Construction phasing designed to minimize disruption (e.g., off-peak work hours, temporary detours with clear signage).

Budget:
Total Estimated Cost: $28.5 million
Funding Sources:

  • Federal Highway Administration (FHWA) Grant: $16.2M
  • State Transportation Fund: $8.0M
  • Municipal Bond (Voter-Approved 2024): $4.3M

Expected Outcomes:

  • 35% reduction in average corridor travel time during peak hours
  • 50% decrease in crash frequency (based on predictive safety modeling)
  • Improved transit on-time performance (+20%)
  • Enhanced accessibility and non-motorized connectivity to schools, parks, and downtown

Project Owner:
Riverbend Department of Transportation (RDOT)
Lead Contractor:
Veridian Infrastructure Group (VIG) — selected via competitive public bid (RFP #RDOT-2025-014)

Prepared: November 9, 2025


image Document not found!

The current Northridge Avenue roadway is functionally obsolete—narrow, outdated, and in poor condition. Traffic volumes have increased by over 70% since 1990, leading to congestion, safety concerns (especially at unsignalized crossings), and frequent flooding during storms. This project aligns with the City’s 2040 Mobility & Equity Plan to improve multimodal access and infrastructure resilience.

RDOT conducted a full right-of-way (ROW) assessment in 2024. Only 6 residential parcels (all commercial-adjacent) require minor easements for drainage or sidewalk realignment. Affected property owners were notified in writing and compensated per state law. No full acquisitions are required. For confirmation, visit the Property Impact Map or contact the project team.
    image There are no reviews yet!

09 November, 2025 (updated: 3 weeks ago)

ghf njhgfyukyu jhgfyutfyjfyh

Achieve Goal

Road repair in okha community

0.00%
Goal

₦5,000,000.00

Raised

₦200.00

Also To Go

₦4,999,800.00

Not Yet Completed

21 days to go

Organized By ↗

Donation Amount

Personal Information

Share Campaign

Donation milestone reached: For successful contributions.

  • Guest

    Amount :₦200.00